Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tpebl domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hyj8tx6hmp34/public_html/wp-includes/functions.php on line 6114
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the theplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hyj8tx6hmp34/public_html/wp-includes/functions.php on line 6114
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra-addon domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hyj8tx6hmp34/public_html/wp-includes/functions.php on line 6114 Feed Engineering – Ritaj Engineers & Consultants
Skip to content
Mechanical Data Sheets of the Main Equipment,Starting from the Process Specifications issued during the BED and Incorporating the Specific Requirements of Codes and Standards to be applied
Development of the main Piping, Instrument, Electricaland Civil Works Layouts
Elaboration of the Main Piping, Instrument, Electrical and Civil Works Layouts
Sizing and Selection of Electrical Equipments
Electrical Load Schedule Management and Forecasts
HV Transmission Line Route & Feasibility